Toilet Refurbishment Works
St Johns C of E School, Stanmore
We removed the existing flooring, cubicles and sanitary ware within the School’s toilet block, and installed a mains incoming feed to supply the new hot water calorifier.
We installed new drainage, softwood timber veneered internal doors, metal frame stud partitions, suspended ceilings, IPS systems, SGL panelled cubicles, sanitary ware, electrical upgrades, new flooring throughout and the toilet block decorated in preparation for handover.