Drainage infrastructure and surfacing upgrade works
Southville Primary School, Feltham
The existing school car park was in poor conditions and was very undulated which contributed to significant surface water ponding following rainfall which prevented staff and visitors from using the full capacity of the car park.
Our team removed the existing asphalt surfaces, along with the undulations throughout the car park and filled problematic discovered soft spots.
We installed new linear drainage channels to manage surface water, and replaced the damaged below ground drainage infrastructure discovered through a CCTV drainage survey, with the surfaces then being prepared and receiving new asphalt surfacing and road markings as designed by the school.