New announcement. Learn more

Stonebridge Barn, Woodchurch

Section 278 Works

Stonebridge Barn, Woodchurch

We installed a new site entrance into an existing green field site in preparation for a new housing development to provide access into the development for the future residents.

We excavated the existing raised banks to formation level and installed new dropped kerbs and edgings to form the site entrance in accordance with the local authorities' approved plans.

Our team installed gabion baskets to ensure compliance with the planning conditions, and a large culvert pipe was installed to assist with surface water running beneath the new site entrance.

The works areas were prepared and surfaced in preparation for handover with the developer who would be carrying out the works inside of the site boundary internally.